// STORM DAMAGE · CASE STUDY
Tree Strike Damage and Water Intrusion, Tampa
A tree strike breached the roof deck of a Tampa residence across four roof planes, opening a path for water intrusion into the structure below. Field documentation identified five separate breach zones, labeled B1 through B5, requiring temporary waterproofing with GAF TuffBuster self-adhered membrane across the F1 through F4 roof sections.
// PROJECT PHOTOGRAPHY









// THE SITUATION
The Situation
A tree strike opened the roof assembly of the residence, compromising the deck across four distinct roof planes identified on the roof sketch as F1(A), F2(B), F3(A), and F4(B). The breach created a direct path for rainwater to enter the attic cavity and travel toward the ceiling below. The roof covering over the main breach area, corresponding to patch zone B1, sustained the largest area of damage, spanning roughly 24 feet by 37.8 feet per the roof diagram labeled Roof Temp/Boardup (B1).
// ASSESSMENT
Assessment
The roof sketch titled TEMP WATERPROOFING w/GAF TuffBuster, dated 7/21/2026, mapped the four roof planes using two ridge lines labeled Roof1 and Roof2. Five breach or vulnerability zones were flagged for temporary repair: Temp Patch1 through Temp Patch4 corresponding to sketch labels B2 through B5, plus the larger Roof Temp/Boardup zone labeled B1 covering the F2(B) plane. The elevation rendering showed the B1 boarded zone as a continuous section along the front roof slope, with the three smaller patch zones spaced along the ridge above it. An interior cross section showed an open ceiling cavity below the compromised roof plane, consistent with water having traveled past the deck into the living space.
// SCOPE OF WORK
Scope of Work
The defined work area covered four roof planes, F1(A), F2(B), F3(A), and F4(B), separated by ridge lines Roof1 and Roof2. The main scope item, Roof Temp/Boardup zone B1, addressed the largest breach on plane F2(B), measuring approximately 24 feet by 37.8 feet on the roof sketch. Four smaller temporary patches, labeled B2, B3, B4, and B5 on the diagram, were scoped for the remaining breach points along the ridge of the F1(A) and F3(A) planes. The surrounding undamaged shingle field was left in place.
// MITIGATION
Mitigation
Temporary roof protection was installed using GAF TuffBuster self-adhered membrane across the identified breach zones. The largest zone, B1, received combined boardup and membrane coverage across the F2(B) plane, while the four smaller zones, B2 through B5, received discrete membrane patches along the ridge sections of F1(A) and F3(A). The main boarded section was installed first along the front slope, followed by the smaller ridge patches moving outward from the Roof1 and Roof2 hip lines.
// DOCUMENTATION
Documentation
Documentation includes a three-page roof sketch titled TEMP WATERPROOFING w/GAF TuffBuster dated 7/21/2026, and a five-page rendering set showing satellite-style 3D views, an elevation view, and an interior cross section of the boarded and patched roof zones. The roof sketch labeled four roof planes, two ridge lines, and five temporary patch locations with corresponding dimensions.
// OUTCOME
Outcome
Temporary waterproofing with GAF TuffBuster membrane was installed across five identified breach zones on four roof planes following the tree strike, protecting the structure from further water intrusion.
// RELATED SERVICE
Storm Damage Restoration// CREW RESTORATION
Request an Assessment
Assess · Document · Mitigate · Recover — across water, mold, fire, and storm.
(813) 838-5961